Neda Engineering have successfully completed a wide range of projects across the industries.

Herewith is a listing of the main projects throughout the Industries Served both Nationally and Internationally:

YEAR CLIENT INDUSTRY SERVICE DETAILS STATUS
2019 Sonae Arauco  Timber  Detail Design  Measure Silo's on site, Generate 3D model, conduct FEA and generate detailed engineering drawings for the propsed new Gearbox Mounting Bracket.  Ongoing 
2018 Mpact Operations  Timber  Detail Design Neda Engineering Group (Neda) was initially contracted to design all the utilities that connects to the new Sodium Sulphate Plant that will be constructed at Mpact Paper Mill (Mpact) in Piet Retief. The initial detail design that was already performed, included Civil design, Structural design, Mechanical design and pipe design. Ongoing 
2018 Puma Energy Namibia  Petrochemical  API-653 Out of Service Inspection  A Neda inspection team will perfom out-of-service inspection of tank #28 with tank calibration in Walvis Bay. 
Complete 
2017 Dwarsrivier Chrome Mine  Mining  EPMC Dwarsrivier Chrome Mine intends to install a Magnetic Chrome Seperation Plant within the existing plant boundaries, but seperate to the plant. The technology is already chosen the new plant needs to be aligned with the given technical parameters.  Ongoing 
2015 Lanxess - Rustenburg Mining PMC Sibahle Neda Engineering has been contracted to design the replacement columns for the regrind structure as the coloumns were showing signs of fatigue. We have also been appointed as the project managers for the upgrade.  Complete 
2015 Puma Energy - Belfast Petro chemical Inspections & Design Puma Energy require the services of Sibahle Neda Engineering to complete tank inspections of 13 above ground storage tanks. 9 out of the 13 tanks are out of service and 3 are still in use. Further more Puma Enegery required a design to upgrade the product pipe routing as well as the electrical MCC room. New designs were also required for a new loading and off-loading facility, spill contaiment system, COC and a firefightinjg system. Complete 
2015 IGBTL - Beira Petro Chemical Design On behalf of IGBTL, Steval Engineering acquired the services of Neda to design 6 above ground storage tanks and the fire fighting system. The facility has a combined working volume of 65 000m³.  Complete 
2015 Sappi - Ngodwana  Pulp and Paper  NDT Neda was contracted to carry out the following services ie. Hydro Testing, MPI and LPT on the pressure vessels including the pipeline welds. AIA on all digesters and pressure vessels. Pressure testing on pipeline and vessels.  Complete
2014 Galana – Matola Petrochemical PMC The project had reached a point where it was in distress with budget and time over runs. Neda was then contracted to take over the PMC role to bring the project back on track and within budget. Previous best practises were implemented from past experience in order to optimize the projects processes and construction. Once complete, the Bulk Fuel Terminal with a combined working capacity of 43 300m³, will supply fuel by rail and road loading gantries to the province of Maputo, Mozambique. Complete
2014 Fueltrade Ghana Petrochemical Design and PMC Tema Fuel approached Neda to assess the current state of their facility's process, layout and functionality with the intent on expanding the facility with the aim of becoming the market leaders in Ghana. Neda's experienced engineers designed the new Gasoline road loading gantry, upgrade of the current gasoline pump and piping system. Once complete, the terminal will substantially increase it's current output. Neda facilitated and executed the tender process and advised the client on which contractor would be best suited for the project Complete
2014 Sonae Novaboard Timber Analysis Structural Analysis – Conveyor 5008 support structure Complete
2014 Mpact Pietretief Timber Design and Draughting Design - Drum Screen Support Structure Complete
2014 Sonae Novaboard Timber Design and Draughting Design - Oil store structure Complete
2014 Senteeko Process Design Design - Boiler Steam lines Complete
2014 TSB - Malelane Sugar Design Design - Magnet Separator Support Platform Complete
2014 Sonae Novaboard Timber Design Design - Modification of chain link conveyor 5008 Complete
2013 SVE Petrochemical Design Detail design for GTM Matola bulk fuel terminal Complete
2013 SVE Petrochemical Design Detail design for GTM Beira bulk fuel terminal Complete
2013 SIL Congo Petrochemical Design and PMC Detail design and PMC for bulk fuel terminal in Lubumbashi Complete
2013 Limeco Zambia Petrochemical Design and tender docs Detail design and generate tender docs for bulk fuel terminal Complete
2013 Puma Energy
Petrochemical Design Design - Horizontal Lifeline system in Bostwana International Terminal Complete
2013 Shanta Mine Mining Design Design - HFO storage facility Complete
2013 Delta EMD Process Design Design - Jib Crane Complete
2013 Mtunda Mine Mining Design Design - Bulk fuel storage facility in Mumi Mine Complete
2013 Puma Energy Petrochemical Design Design - Bulk fuel storage facility for Msasa Harare Complete
2012 Glencore Petrochemical FEED and PMC Bulk fuel terminal and LPG storage FEED and PMC in Beira Complete
2012 Glencore Petrochemical Detail design and PMC New approach roads for CFM Beira Complete
2012 PetroBeira Petrochemical PMC PMC for tank farm upgrade Complete
2012 Puma Petrochemical Design Detail design of Walvisbay extension and upgrade Complete
2012 Puma Petrochemical Design Detail design of fuel storage and distribution for Swakopmund mine Namibia Complete
2012 X-Strata Lydenburg Mining Design Design - Slurry system Complete
2012 Delta EMD   Design Design - Boiler house structure Complete
2012 Simunye Petrochemical Design Design - Distillary plant Complete
2011 X-Strata Kroondal Mining Detail design and PMC Design, build and manage - Reflux Classifier 2020 support. Complete
2011 X-Strata Helena Mining Detail design and PMC Design, build and manage - Reflux Classifier 2020 support Complete
2011 X-Strata Thorncliffe Mining Detail design and PMC Design, build and manage - Reflux Classifier 2020 support Complete
2011 X-Strata Helena Mining Detail design and PMC Design, build and manage - Constant Feed Clarifier Complete
2011 X-Strata Helena Mining Detail design and PMC Design, build and manage - 2 Boom Stackers and foundry pads. Complete
2011 Verulam Sawmills Timber Design Design - Cyclone Grit arrestor and Cyclone support structure Complete
2011 Puma Energy Petrochemical Design Design - Rail ganntries in DRC Complete
2011 X-Strata Helena Mining Design Design - CFC Tank support structure Complete
1999 Sasol Synfields Petrochemical Piping Draughting Services 5 year contract – Draughting of existing piping systems. Complete